Power solutions built around your site

Businesses in Myanmar carry two power problems at once: electricity is a real operating cost, and grid supply cannot always be relied on. Our engineers start from how your site actually runs, then propose only the equipment it needs.

Clean white generator installed on a paved base beside a modern building
Authentic Stanol generator installation

01 · Approach

Sized and phased to your operation

Not every site needs a hybrid system. We size and phase each proposal to your actual equipment, critical loads, typical outage duration, business needs and budget, so you can start with what matters most and add capacity later if it makes sense.

  • Solar PVCan offset daytime grid or fuel use and reduce operating cost where the load profile and site suit it.
  • Standby generatorSupports priority loads through grid outages, sized to start-up demand and runtime.
  • Energy storageConsidered where the required runtime and budget justify it, not added by default.

02 · How we work

Six steps from survey to service

  1. 01

    Site survey

    Survey the site and the existing supply.

  2. 02

    Load calculation

    Identify essential loads, start-up demand and required runtime.

  3. 03

    System design

    Compare solar, standby generator and storage where suitable.

  4. 04

    Quotation

    Show equipment, scope, options and budget.

  5. 05

    Installation & commissioning

    Install, test and hand over.

  6. 06

    After-sales service

    Provide preventive maintenance, troubleshooting and spare-parts support as applicable.

03 · Real installations

Work on the ground

Two separate projects, shown individually.

Orange generator on a concrete plinth beside planting and a white boundary wall

Standby generator

Generator installation reference

Power/DG projects
Rooftop solar PV array at the IIDA-IMM project in Yangon

Rooftop solar + storage

IIDA-IMM, Yangon, Myanmar

124.8 kWp solar PV · 286 kWh BESS

View case study