Commercial solar and storage, engineered around your site and loads.
Start with the equipment you need to run, when you need power and the space available at your site. Stanol Solarize brings solar, storage and generator integration into one project discussion, with separate routes to panel selection, battery requirements and documented energy-storage products.
Visit the main Stanol Solarize page
Commercial & industrial EPC
One engineering team, from survey to support.
EPC means engineering, procurement and construction: Stanol Solarize designs the system, supplies the equipment and installs it, so the array, inverter, protection and any storage are planned together rather than bought as separate parts.
For commercial and industrial operators, that starts with the actual site. Daytime and overnight loads, outage patterns, critical equipment, available space and budget decide whether solar alone, solar with storage, or a hybrid arrangement makes sense. Proposals can be sized and phased to suit.
System routes
Solar, storage or hybrid: chosen for the site.
- 01
Commercial & industrial solar
Rooftop or site PV for offices, plants, hotels and facilities, sized against daytime consumption, available area and the electrical supply.
Explore solar PV - 02
Solar + storage
Battery energy storage added where the site needs stored energy for priority loads or evening use. Capacity is matched to the loads and the inverter, not a headline label.
Explore battery storage - 03
Hybrid grid, solar, ESS and generator
Utility supply, solar, storage and an existing or new diesel generator coordinated as one arrangement, where the site's outages and critical loads call for it.
Plan a hybrid system
Not every site needs storage or a hybrid system. Suitability depends on the equipment you run, critical loads, outage duration and business needs.
Components & system selection
Compatible components, not headline ratings.
Engineered systems or component requirements
A complete solar project needs a coordinated array, inverter, protection and, where required, battery storage. If you are adding to an existing installation, provide its equipment details first. A component should be selected for compatibility, not simply matched to a headline power rating.
Solar panels, inverters & batteries
Explore panel planning, lithium battery and ESS requirements, and OKAYA tubular battery solutions as distinct selections. Eenovance's documented families provide product-specific storage references. No one battery or inverter arrangement is suitable for every load and charging source.
From requirements to a proposal
Share the site location, daytime and overnight loads, available installation space and existing equipment. Discuss the intended role of solar, the grid, storage and generators. The resulting system configuration and commercial terms are confirmed for the project, not assumed from an example installation.
Documented installations
Solarize project work.

Solar + BESS
Myint Moh San Hotel
Nay Pyi Taw / Pyinmana
- Solar
- 100 kW
- BESS
- 300 kWh

Solar PV + BESS
IIDA-IMM
Yangon, Myanmar
- Solar PV
- 124.8 kWp
- BESS
- 286 kWh

Solar + storage · Agro-Industry
Rice Mill — Naung Peng, Shan State
Naung Peng, Shan State, Myanmar
- Solar PV
- 56 kWp
- Battery
- 61.4 kWh
Lifecycle support
Supported after handover.
- 01
Site survey
Loads, operating hours, roof or ground space, shading and the existing electrical system.
- 02
System design
Array, inverter, protection and, where required, storage and generator integration.
- 03
Supply & EPC
Equipment supply, installation and electrical works delivered as one engineered project.
- 04
Commissioning
Testing and handover of the installed configuration with the site team.
- 05
O&M support
Maintenance, fault investigation and spare-parts enquiries through after-sales service.
Bring your site details to a Stanol Solarize engineer.
Share the site location, daytime and overnight loads, installation space and existing equipment. An enquiry starts a technical and commercial discussion; configuration and terms are confirmed for your project.